Martyn Hilbert's Railway Photography

Domov > Isle Of Wight > Isle of Wight

IMG_1272_28800x51329.jpg
483004 at Smallbrook.5 zobrazeníAn early start, as 483004 leaves Smallbrook Junction behind, and heads for Ryde with the 07.18 service from Shanklin on the 4th July 2011. The signal in the background protects the start of the single line between Smallbrook Junction and Sandown.
IMG_1275_28800x59429.jpg
483004 at Smallbrook Lane.9 zobrazení483004 is about to pass under Smallbrook Lane Bridge, as it hurries the 07.49 Ryde Pier Head to Shanklin service on the 4th July 2011.
IMG_1276_28800x53329.jpg
483009 departs from Ryde Esplanade.9 zobrazení483009 departs from Ryde Esplanade with the 08.07 service from the Pier Head to Shanklin on the 4th July 2011. The former down line, once used by the now discontinued pier shuttle is heavily rusted. In the adjacent bus terminal, a pair of Southern Vectis Volvo B7 double deckers are at work.
IMG_1277_28800x53329.jpg
483004 at Park Road Ryde.12 zobrazeníHaving left Ryde St Johns Road behind, 483004 negotiates the curve as it approaches the bridge at Park Road, Ryde with 08.18 Shanklin to Ryde Pier Head service on the 4th July 2011. The unit is passing the now disused Southern Vectis Northlight bus garage dating from 1938.

IMG_1278_28800x65729.jpg
483007 & 008 in Ryde Depot.9 zobrazeníSister units, 483007 & 483008 receive maintenance inside Ryde Depot on the 4th July 2011.
IMG_1279_28584x80029.jpg
483004 at Ryde St Johns Road.17 zobrazení483004 departs from Ryde St Johns Road on the 4th July 2011 with the 08.49 Ryde Pier Head to Shanklin service. The unit is passing the Up Starter Home Signal, complete with feathered finial!
IMG_1280_28800x53329.jpg
483009 at Ryde St Johns Road.15 zobrazení483009 passes the signalbox at Ryde St Johns Road with the 08.38 departure from Shanklin on the 4th July 2011. The signalbox here came from Waterloo (SECR), in 1928 as part of the Southern Railway improvements to the Island system. The now box controls the whole of Island Line.
IMG_1283_28800x55129.jpg
483004 at Brading.26 zobrazeníRunning along what was a double track section of line until 1988, 483004 approaches Barnes Footpath Crossing on the south side of Brading Station, with the 09.18 Shanklin to Ryde Pier Head service on the 4th July 2011.

IMG_1285_28800x51829.jpg
483004 approaches Brading.28 zobrazeníThe footpath disappearing to the right of this view, follows the course of the Bembridge Branch, closed to passengers in September 1953. 483004 runs past as it approaches Jones Footpath Crossing on the north side of Brading, with the 09.49 Ryde Pier Head to Shanklin service on the 4th July 2011.
IMG_1286_28800x53329.jpg
483007 Brading Station Footbridge.8 zobrazeníFresh from maintenance at Ryde Depot, 483007 arrives at Brading on the 4th July 2011 with the 10.07 Ryde Pier Head to Shanklin service. The re-opening of the footbridge to access the restored island platform and signalbox, as part of the station heritage centre, has opened up this viewpoint.
IMG_1287_28800x53329.jpg
483007 at Brading Station.17 zobrazeníViewed from the restored footbridge, 483007 awaits custom as it heads south with the 10.07 Ryde Pier Head to Shanklin Service on July 4th 2011. There are plans afoot to re-instate a crossing loop at Brading, which will permit an equal balanced 30 minute service, instead of the current 20/40 minute frequency.
IMG_1288_28800x53329.jpg
483007 at Brewhouse Crossing.4 zobrazení483007 speeds by Brewhouse Occupation Crossing, near Yarbridge with the 18.38 Shanklin to Ryde Pier Head on the 4th July 2011.
Počet súborov: 283 na 24 stránke(kách)

Vyberte jazyk: